DA/2018/0382
06-Jun-2018
OUTLINE
Barby
BARBY & KILSBY
6, The Green, Barby, Northamptonshire, CV23 8TS

This application has already been decided. You cannot comment on it

Mr E McDowell
Outline application for demolition of workshop and construction of a pair of semi-detached dwellings with on site parking (revised scheme).
Approval Outline.
27-Nov-2018




Current applications details are available online, older applications may not have all details complete. We cannot guarantee the accuracy of this data. If you have any queries regarding older applications please contact the Council's Planning Department on 01327 871100.

 
Conditions & Reasons
       


   Conditions - Notes - Reasons

Type Description
Condition Approval of the details of the layout, scale, external appearance of the building(s), the means of access thereto and the landscaping of the site (hereinafter called "the reserved matters") shall be obtained from the Local Planning Authority in writing before any development is commenced.
Condition Plans and particulars of the reserved matters referred to above relating to the layout, scale, external appearance of any building(s) to be erected, the means of access to the site and the landscaping of the site shall be submitted in writing to the Local Planning Authority and shall be carried out as approved.
Condition An application for approval of reserved matters must be made to the Local Planning Authority not later than the expiration of three years from the date of this permission.
Condition The development hereby permitted shall be begun either before the expiration of 3 years from the date of this permission, or before the expiration of 2 years from the date of approval of the last of the reserved matters to be approved.
Condition The development hereby permitted shall be carried out in accordance with the amended plans reference 032-01 Rev H and Drawing no.032-02 Rev H .and Bat Assessment: Preliminary Roost Assessment produced by Ecolocation dated 26th April 2018.
Condition Adequate space shall be provided within the site for the parking of vehicles in accordance with a plan to be submitted to and approved by the Local Planning Authority and shall be laid out, surfaced, and marked out before the premises are occupied and permanently set aside for that purpose.
Condition No dwelling shall be occupied until visibility splays are provided from the set back gateway to the extremities of the site frontage in accordance with the approved plan. Those areas forward of the visibility splays shall be cleared of all obstructions and levelled to not exceeding 0.6m above carriageway level.
Condition Notwithstanding the provisions of the Town & Country Planning (General Permitted Development) (England) Order 2015 (as amended) (or any Order revoking and re-enacting that Order with or without modification), no fences, gates, walls or other means of enclosure shall be erected within the curtilage of any dwellinghouse forward of any wall of that dwellinghouse which fronts on a road.
Condition Notwithstanding the provisions of the Town & Country Planning (General Permitted Development) (England) Order 2015 (as amended) (or any Order revoking and re-enacting that Order with or without modification), no development shall be carried out which falls within Classes A,B,C,D,E & F of Part 1 of Schedule 2 to the Order without the prior express consent of the Local Planning Authority.
Condition The development shall be carried out strictly in accordance with the recommendations in the Bat Assessment: Preliminary Roost Assessment produced by Ecolocation dated 26th April 2018.
Condition No development shall take place until a site investigation of the nature and extent of contamination has been carried out in accordance with a methodology which has been previously been submitted to and approved in writing of the Local Planning Authority. The results of the site investigation shall be made available to the Local Planning Authority before any of the development begins. If any contamination is found during the site investigation, a report specifying the measures to be taken to remediate the site to render it suitable for the development herby permitted shall be submitted to and approved in writing by the Local Planning Authority. The site shall be remediated in accordance with the approved measures before development begins.
Condition If, during the course of the development, any contamination is found which has not been identified in the site investigation; additional measures for the remediation of this source of contamination shall be submitted to and approved in writing by the Local Planning Authority. The remediation of the site shall thereafter incorporate the approved additional measures.
Condition No demolition or construction work (including deliveries to or from the site) that causes noise to be audible outside the site boundary shall take place.
Reason To comply with Section 92 of the Town & Country Planning Act 1990.
Reason To comply with Section 92 of the Town & Country Planning Act 1990.
Reason To comply with Section 92 of the Town & Country Planning Act 1990.
Reason To comply with Section 92 of the Town & Country Planning Act 1990.
Reason To ensure that the development is carried out in accordance with agreed amendments.
Reason In the interests of the safety and convenience of users of the adjoining highway.
Reason In the interests of public and highway safety.
Reason In the interests of the visual amenity of the area.
Reason In the interests of visual amenity of the area.
Reason In order to protect local bats and to protect and provide enhancements for the local birds in accordance with Policy BN2 of the West Northamptonshire Joint Core Strategy.
Reason It is necessary to ensure that potential risks from contamination have been fully assessed before any development commences so that it can be dealt with from the outset in the detailed design of the proposed development.
Reason It is necessary to ensure that potential risks from contamination have been fully assessed before any development commences so that it can be dealt with from the outset in the design of the proposed development.
Reason No demolition or construction work (including deliveries to or from the site) that causes noise to be audible outside the site boundary shall take place. Reason: To ensure the protection of the local amenity throughout construction works
Informative In making this decision, the Local Planning Authority has had regard to the requirements of paragraph 38 of the National Planning Policy Framework.
Informative At all times during the carrying out of operations authorised or required under this permission, best practicable means shall be employed to minimise dust. Such measures may include water bowsers, sprayers whether mobile or fixed, or similar equipment. At such times when due to site conditions the prevention of dust nuisance by these means is considered by the Local Planning Authority in consultations with the site operator to be impracticable, then movements of soils and overburden shall be temporarily curtailed until such times as the site/weather conditions improve such as to permit a resumption.